Back to glossary
generationterm

Floating Offshore Wind (FLOW)

Also known as: offshore wind farm, floating wind, wind at sea, marine wind farm, wind turbine offshore, offshore wind power

Floating offshore wind uses buoyant platforms moored to the seabed to deploy turbines in waters deeper than around 50 metres, where fixed-bottom foundations are impractical, unlocking stronger and more consistent wind resources further from shore.

What it is

Floating offshore wind (FLOW) is a form of offshore wind generation that mounts turbines on buoyant platforms anchored to the seabed by mooring lines, rather than fixing them directly to the seabed with monopile or jacket foundations. This approach enables deployment in water depths beyond roughly 50 metres, where conventional fixed-bottom structures become technically or economically infeasible. By moving further offshore, floating arrays can access stronger, steadier wind resources and avoid many of the spatial conflicts that constrain nearshore development. The technology draws heavily on decades of floating platform experience in the oil and gas sector, and the three dominant foundation types are the spar-buoy (stabilised by deep-draft ballast), the semi-submersible (stabilised by distributed buoyancy across multiple columns), and the tension-leg platform or TLP (held in place by pre-tensioned vertical tendons fixed to the seabed).

Why it matters in procurement / cleantech

The UK government has set a target of up to 5 GW of floating offshore wind by 2030, within the broader 43–50 GW offshore wind ambition. The Crown Estate's Leasing Round 5 — the UK's first dedicated floating wind seabed round — is allocating up to 4.5 GW across three project sites in the Celtic Sea off South Wales and South West England, with lease agreements now signed by Equinor, Gwynt Glas (an EDF/ESB joint venture), and Ocean Winds (an EDPR/ENGIE joint venture). On the revenue side, floating wind received its own dedicated CfD auction pot (Pot 4) for the first time in Allocation Round 7, where two projects totalling roughly 192.5 MW secured contracts at a strike price of around £216/MWh — significantly above the fixed-bottom clearing price but reflective of the technology's earlier maturity curve. DESNZ has signalled further tailored CfD terms for FLOW in AR8, including a longer longstop period and a reduced required-installed-capacity threshold. Port infrastructure is a critical procurement bottleneck: floating foundations are assembled quayside rather than at sea, demanding deep-draught berths, heavy-lift cranes, and large wet-storage areas that no UK port yet provides at commercial scale. The FLOW Taskforce estimates that up to 11 ports will need substantial upgrades, and the government has intervened with schemes such as FLOWMIS to de-risk early port investment.

Common types / variants

  • Spar-buoy — a deep-draft ballasted cylinder, proven at the Hywind Scotland array; best suited to water depths above 100 m.
  • Semi-submersible — multiple buoyant columns connected by pontoons, with a shallower draft that allows quayside turbine assembly and tow-out; the most widely proposed design for Celtic Sea projects.
  • Tension-leg platform (TLP) — a buoyant hull anchored by vertical steel tendons, offering high motion stability but more complex installation.

Related terms

[contracts-for-difference], [grid-connection], [levelized-cost-of-energy]

what is floating offshore wind
what does FLOW stand for in energy
how is floating wind different from fixed-bottom offshore wind
what are the main types of floating wind foundation
how much floating offshore wind does the UK want by 2030
what is the Celtic Sea leasing round
does floating wind get its own CfD pot
why do floating wind projects need special ports
what is a semi-submersible wind platform
who won the Celtic Sea floating wind leases
contracts for difference grid connection levelized cost of energy

Find live offshore wind tenders

Find live offshore wind tenders

Last reviewed: 12 July 2026