Levelized Cost of Energy (LCOE)

Also known as: levelised cost of electricity, LCoE, levelized cost

Levelized cost of energy (LCOE) is the average cost per unit of electricity over an asset's lifetime — total lifetime costs divided by total lifetime generation, discounted — used to compare technologies.

What it is

Levelized cost of energy (LCOE) is the average lifetime cost of producing electricity from an asset: all discounted lifetime costs (CAPEX, OPEX, fuel, financing) divided by discounted lifetime generation, expressed per MWh. It allows technologies with very different cost profiles — high-CAPEX solar versus fuel-heavy gas — to be compared on one number.

Why it matters in procurement / cleantech

LCOE anchors bid pricing in generation tenders and auctions, and falling renewable LCOEs are the reason solar and wind now win on cost in most markets. Its limitation matters too: LCOE ignores when power is produced, so system value, intermittency, and balancing costs need separate treatment in evaluation.

Related terms

See [capital-expenditure], [operating-expenditure], [yield-forecast], and [internal-rate-of-return].

What is LCOE?
How is levelized cost of energy calculated?
Why is LCOE used to compare solar and gas?
What are the limitations of LCOE?
what does lcoe stand for
how do you calculate the cost per mwh of a power plant
why has solar lcoe fallen so much
what does lcoe not account for
how is lcoe used in tender pricing
what is levelised cost of electricity
why doesn't lcoe capture system value