Flexibility is the ability to adjust electricity generation, consumption or storage in response to grid signals. It underpins system balancing as renewables grow, and is delivered through batteries, demand-side response, interconnectors, V2G-enabled EVs and other dispatchable assets — creating a fast-growing market for providers at both national and local network level.

What it is

Flexibility is the ability to increase, decrease or shift electricity generation, consumption or storage in response to signals from the grid. As intermittent renewables displace dispatchable fossil generation, the power system needs assets that can ramp up when the wind drops, absorb surplus solar at midday, or reduce demand during evening peaks. Any technology or behaviour that can adjust its power profile on command — batteries, demand-side response, vehicle-to-grid (V2G) EVs, electrolysers, interconnectors, or flexible generation — is a source of flexibility.

How it works

Flexibility operates across two broad layers: national system balancing, managed by the National Energy System Operator (NESO), and local constraint management, run by Distribution System Operators (DSOs, formerly DNOs acting in a system-operation role).

National level. NESO procures flexibility through several market routes. The Balancing Mechanism is a continuous near-real-time market where generators, storage operators and aggregators submit priced bids and offers to add or remove power; NESO selects the cheapest options to keep the system in balance. Alongside it, NESO runs frequency response services — including Dynamic Containment, Dynamic Moderation and Dynamic Regulation — that reward assets for near-instantaneous injection or withdrawal of power to hold system frequency at 50 Hz. The Demand Flexibility Service (DFS), originally a winter contingency tool, has evolved into a year-round balancing instrument: as of March 2026, over 2.46 million consumers and businesses are signed up, and the service can now reward participants for increasing consumption during periods of surplus renewable output as well as reducing it during peaks. The Capacity Market complements these short-term services by securing firm capacity — including flexible storage and DSR — years ahead of need.

Local level. All six GB DSOs now run regular, transparent flexibility tenders to manage distribution-network constraints. They publish requirements by zone and procure turn-up (increase consumption / reduce export) and turn-down (reduce consumption / increase export) services through platforms such as UKPN's Localflex and Electron's ElectronConnect. Contracted local flexibility volumes grew from around 116 MW in 2018 to approximately 9 GW in 2025, making GB the world's largest local flexibility market. Providers need as little as 10 kW to participate in some DSO zones, and aggregators can bundle domestic assets — EV chargers, heat pumps, home batteries — into tradable portfolios.

Revenue stacking. A single flexible asset can earn from multiple markets: for example, a battery storage system might hold a Capacity Market agreement for long-term capacity assurance, bid into the Balancing Mechanism for energy arbitrage, provide Dynamic Containment for frequency response, and serve a local DSO constraint contract — all within the same week. Elexon, appointed as Market Facilitator in December 2025, is working to simplify cross-market participation through a flexibility market catalogue and standardised onboarding.

Why it matters in procurement / cleantech

Flexibility is central to the UK's clean power strategy. The Clean Flexibility Roadmap, published jointly by DESNZ, Ofgem and NESO in July 2025, targets roughly 55 GW of total flexibility capacity by 2030 and 204 GW by 2050, up from approximately 25 GW today. The Roadmap also set NESO a minimum ambition of 750 MW of new industrial and commercial flexibility by 2030. This target drives substantial procurement. DSOs issue flexibility tenders multiple times a year — both long-term (multi-year availability contracts) and day-ahead utilisation calls — creating recurring commercial opportunities for battery operators, aggregators, industrial sites with shiftable loads, and owners of co-located generation-plus-storage. NESO's own procurement of balancing and ancillary services runs to billions of pounds annually.

For suppliers and developers, flexibility revenues are often what close the business case for battery storage, demand-response platforms or smart EV-charging networks. Vehicle-to-grid technology, still nascent but scaling — Ofgem estimates that V2G-enabled EVs could contribute around 16 GW of daily flexible capacity by 2030 if half the UK's projected EV fleet participates — adds a further dimension, turning parked vehicles into distributed grid assets.

Common types / variants

  • Supply-side flexibility: dispatchable generation (gas peakers, hydro), curtailable renewables, interconnector flows.
  • Demand-side response (DSR): industrial load-shifting, commercial building management, smart EV charging, domestic appliance scheduling via time-of-use tariffs.
  • Storage-based flexibility: grid-scale lithium-ion BESS, long-duration technologies (pumped hydro, liquid air, flow batteries), behind-the-meter batteries.
  • Vehicle-to-grid (V2G): bidirectional EV charging that exports stored energy to the grid or home during peak periods and recharges overnight when power is cheap.

Key considerations

  • Market access is getting easier, but complexity remains. Elexon's Market Facilitator role and the forthcoming Flexibility Market Asset Register (expected 2027) aim to let providers join over 20 flexibility sub-markets with a single registration — but today, participating across multiple DSOs and NESO services still requires navigating separate platforms and prequalification processes.
  • Market-wide Half-Hourly Settlement (MHHS) is being rolled out, with full migration expected by May 2027. Once live, it will enable granular time-of-use pricing that rewards flexible consumers and unlocks millions of domestic assets for aggregation.
  • BSC Modification P483, approved by Ofgem in August 2025, removed the half-hourly settlement prerequisite for aggregators to trade domestic flexibility, immediately opening the market to around 345,000 additional households and small businesses.
  • The DFS now works in both directions. Since March 2026, NESO's Demand Flexibility Service can reward participants for increasing electricity use during periods of excess renewable supply, not just reducing it during peaks — a significant expansion of its scope.
  • Locational value is growing. DSO tenders pay different prices in different constraint zones, and payments of up to £600/MWh have been offered in some UKPN zones. Understanding where your asset connects is increasingly important for maximising returns.
  • Policy continues to evolve rapidly. The Clean Flexibility Roadmap introduced a Flexibility Commissioner, and NESO is consulting on updates to its balancing terms through July 2026. Always check the NESO balancing services page and Elexon's flexibility catalogue for current rules before committing to a market strategy.

Related terms

[battery-energy-storage-system], [capacity-market], [smart-grid], [virtual-power-plant], [distributed-energy-resources], [ev-charging-infrastructure], [long-duration-energy-storage], [intermittency].

what is flexibility in energy
what are flexibility services UK
how do I provide flexibility to the grid
what is demand side flexibility
how do local flexibility markets work
what is the Demand Flexibility Service
how much flexibility does the UK need by 2030
what is a flexibility service provider
how do DSO flexibility tenders work
can batteries earn money from flexibility
what is the Clean Flexibility Roadmap
what is V2G flexibility
who buys flexibility services
battery energy storage system capacity market smart grid virtual power plant distributed energy resources ev charging infrastructure long duration energy storage intermittency

Find flexibility services tenders

Find flexibility services tenders

Last reviewed: 12 July 2026