Also known as: long duration energy storage, LDES, multi-day storage, seasonal storage, long-term energy storage
Long Duration Energy Storage (LDES) covers technologies that store electricity for 8 hours or more — typically multi-day or seasonal — to balance a renewables-heavy grid. In the UK it is supported by Ofgem's cap and floor scheme, targeting 4–6 GW of capacity by 2030.
Long Duration Energy Storage (LDES) refers to technologies that store electricity for extended periods — many hours, days or even seasons — and release it back to the grid when needed. The defining feature is duration: where a conventional grid battery typically discharges over 1–4 hours, LDES is built to hold and dispatch energy over much longer windows. In the UK's cap and floor scheme, the qualifying threshold is a continuous storage duration of at least 8 hours, and the technology's real value lies in multi-day and seasonal balancing.
LDES exists to solve the core problem of a renewables-heavy grid: wind and solar are intermittent and non-dispatchable, so surplus generation on windy or sunny days must be stored and shifted to periods of low output. Instead of paying wind and solar operators to stop generating on particularly windy or sunny days, long duration storage can store that excess power so generators keep running, then release it later when the weather changes and there isn't enough renewable generation to meet demand.
LDES is a category, not a single technology. The UK already operates around 2.8 GW of LDES — all of it pumped hydro. Great Britain currently has 2.8 GW of LDES across four Pumped Storage Hydro facilities in Scotland and Wales, which operate like natural batteries, with electricity stored by pumping water up a mountain to be released when required.
The economics, not the physics, are the hard part. No new LDES infrastructure has been built in the last four decades owing to numerous barriers, including high upfront costs. To fix this, the UK introduced the cap and floor scheme, administered by Ofgem and modelled on the regime used since 2014 for electricity interconnectors. It works as a two-sided revenue guarantee:
When revenues fall below a set minimum (the floor), consumers top up the difference through a charge on energy bills; when revenues are above a set maximum (the cap), this extra money goes back to consumers through reductions in network charges.
Developers may request a shorter term, but not less than 20 years.
Ofgem opened the first application window in April 2025. An initial group of 171 projects applied to the scheme, and the regulator confirmed that 77 applications were eligible to progress to the second phase.
The same financial model will be used to set initial cap and floor levels at regime award in the summer of 2026.
LDES is one of the most significant emerging procurement pipelines in UK cleantech. The Clean Power 2030 Action Plan targets 23–27 GW of battery capacity and 4–6 GW of long-duration energy storage. NESO's longer-range modelling points much higher — government analysis suggests the UK could need around 20 GW of LDES by 2050.
For suppliers, the cap and floor windows function as a forward project pipeline. Successful developers go on to procure civil works, EPC contracts, turbines and pumps (for pumped hydro), tanks and cryogenic plant (for liquid air), electrolyte and stacks (for flow batteries), grid connection works and long-term O&M. The published eligibility lists, locations and delivery years (2030 and 2033 tracks) give the supply chain visibility on timing.
The cap and floor scheme itself is not a public tender in the procurement-law sense — it is a revenue support mechanism, which is why no commercial_models tag is attached here. But projects awarded support can still stack revenues:
Scheme projects are eligible to participate in the ancillary service markets and the Capacity Market, and Ofgem is considering whether to make participation a condition of support.
This is the key contrast with short-duration BESS, which earns purely from merchant trading, frequency response and capacity payments.
LDES spans several technology families, each with different durations, maturity and geography:
Pumped hydro storage (PSH) — the only mature, large-scale LDES in the UK today; reservoir-based, very long-lived.
Flow batteries (e.g. vanadium redox) — several UK companies are advancing flow battery systems that can provide 8–12 hours of storage with minimal degradation.
Liquid air energy storage (LAES) and compressed air energy storage (CAES) — air storage technologies store energy by pressurising or cooling air, then re-expanding it to generate electricity.
Thermal energy storage (TES) — stores energy as heat (e.g. molten salt), with a strong role in industrial decarbonisation.
Iron-air and gravity storage — newer, lower-maturity chemistries and mechanical concepts targeting multi-day duration.
Note that the cap and floor scheme is technology-neutral: lithium-ion technologies of sufficient capacity are likely to be eligible under the scheme, as well as more traditional LDES technologies such as pumped hydro.
8-hour threshold is strict. The scheme set a minimum continuous storage duration of eight hours and specified this must be continuous rated power, to stop shorter-duration projects gaming the system by bidding only a smaller segment of their MW capacity.
Legislation is now in place. The Planning and Infrastructure Act 2025 received Royal Assent, enshrining in law a new mechanism to support the next generation of long duration electricity storage.
Windows are sequential. Window 1 covered projects deliverable by 2030 or 2033; later windows (Window 2 timing was under consideration in early 2026) will cover projects beyond that. Funding flows through network charges, managed via NESO.
The scheme is evolving — financial model details, locational signals and Capacity Market interactions were still being finalised through 2026, so always check Ofgem's live guidance before applying.
COMMON QUESTIONS
Explore LDES tenders
Explore LDES tendersLast reviewed: 22 June 2026