Capacity Market (CM)

Also known as: capacity auction, T-4, T-1, capacity mechanism, mercato della capacità

The Capacity Market is the UK's main mechanism for ensuring electricity security of supply. Generators, battery storage, demand-side response providers and interconnectors compete in annual descending-clock auctions to win Capacity Market Agreements — fixed payments in return for committing to deliver capacity during periods of system stress.

What it is

The Capacity Market (CM) is a UK government mechanism, introduced in 2014 under Electricity Market Reform, designed to guarantee that Great Britain's electricity system has enough reliable capacity to meet peak demand — even as intermittent renewables grow. Rather than paying for energy generated, the CM pays providers for being available to deliver power (or reduce demand) when the system is under stress. Generators, battery storage systems, demand-side response (DSR) providers and interconnectors all compete in annual auctions for Capacity Market Agreements, receiving a steady, predictable revenue stream in exchange for a legally binding commitment to perform when called upon.

How it works

The CM operates through two annual auctions, both administered by the National Energy System Operator (NESO) as Delivery Body.

  1. T-4 auction. Held four years ahead of the delivery year, this is the main procurement event. DESNZ, informed by NESO's demand and reliability forecasts, sets a target volume of capacity. The auction runs as a descending clock: it opens at the price cap (currently £75/kW/year) and drops in £5/kW increments each round. Participants either remain in or exit at the minimum price they are willing to accept. When remaining capacity falls to the target, the auction clears and every remaining bidder wins a Capacity Market Agreement at that single clearing price.

  2. T-1 auction. Held one year ahead, this tops up volumes in light of updated demand forecasts and any changes in available capacity since the corresponding T-4. Only one-year agreements are awarded in the T-1.

  3. Agreement lengths. Existing plant typically receives one-year agreements. New-build projects that meet capital-expenditure thresholds can secure multi-year agreements — up to 15 years for high-capex builds, up to nine years at the mid-tier threshold introduced for the 2029/30 round, and up to three years for low-carbon units with zero capex.

  4. De-rating factors. Not all capacity is equally dependable, so NESO applies technology-specific de-rating factors. These convert nameplate capacity into a "de-rated" figure reflecting realistic availability during stress events. For battery storage, the factor depends on discharge duration — short-duration systems (e.g. 0.5-hour) receive very low factors, while systems of four hours or more receive substantially higher ones. Wind and solar are heavily de-rated (typically low single-digit percentages) because of intermittency.

  5. Delivery obligations and penalties. During a delivery year (October to September), providers must demonstrate availability through Satisfactory Performance Days and respond during declared System Stress Events. Providers that fail to deliver their adjusted capacity obligation during a stress event face financial penalties, capped at 200% of the unit's monthly capacity payments. Those that over-deliver receive a share of the penalty pool.

  6. Funding. Capacity payments are funded by a statutory levy on licensed electricity suppliers (the Capacity Market Supplier Charge), ultimately passed through to consumer bills.

Why it matters in procurement / cleantech

The CM is one of the primary revenue underpinnings for flexible and firm-power assets in the UK. For battery storage developers, a multi-year Capacity Market Agreement provides a contracted floor revenue that supports project finance alongside merchant trading, ancillary services and wholesale arbitrage. In the most recent T-4 auction (for delivery in 2029/30), batteries secured around 1.2 GW of de-rated capacity, with longer-duration four- and five-hour systems increasingly prominent. DSR providers — aggregators, industrial sites and EV charging operators — also compete, and together DSR and storage now routinely account for a significant share of awarded capacity.

For EPC contractors, O&M providers and equipment suppliers, each auction round's published results reveal a forward pipeline: which projects won, their capacities, delivery years and, for new-build, the capex thresholds they met. The CM thereby functions as a demand signal for construction and supply-chain activity, much as CfD allocation rounds do in the generation sector.

Key considerations

  • Clearing prices can swing sharply. The 2029/30 T-4 auction cleared at £27.10/kW/year — less than half the £60/kW seen in each of the three preceding T-4 rounds — driven by a surplus of pre-qualified capacity against a lower target. The T-1 for 2026/27 cleared at just £5/kW/year. Lower prices reduce revenue certainty for marginal participants.
  • De-rating methodology is under review. NESO has acknowledged that current storage de-rating factors may undervalue battery contributions during stress events, particularly for centrally dispatched assets. Any upward revision would materially improve battery CM economics.
  • Low-carbon contract rules are evolving. From the 2029/30 round, a new nine-year agreement tier was introduced for declared low-carbon units meeting an intermediate capex threshold of £205/kW. This directly supports longer-duration battery and clean-firm projects.
  • Nuclear lifetime extensions are reshaping auction dynamics. EDF extensions at Heysham 1, Hartlepool and other sites pushed nuclear to roughly half of T-1 awarded capacity in 2026, while government decisions to offer CfD-style support for nuclear and biomass life-extensions have reduced CM procurement targets and contributed to lower clearing prices.
  • Penalties for non-delivery have been tightened. The penalty rate was increased sixfold in recent reforms, though monthly and annual penalty caps remain in place, limiting total exposure to 200% of monthly payments or 100% of annual payments.
  • Secondary trading offers flexibility. Providers can transfer obligations to another unit before a stress event through secondary trading, or reallocate volumes between their own units after an event — useful risk-management tools, especially for storage operators managing degradation.

Related terms

[battery-energy-storage-system] · [contracts-for-difference] · [long-duration-energy-storage] · [virtual-power-plant] · [smart-grid] · [intermittency]

what is the capacity market UK
how does the UK capacity market work
what is a T-4 capacity market auction
what is the difference between T-4 and T-1 auctions
can batteries participate in the capacity market
what is a de-rating factor in the capacity market
what was the latest capacity market clearing price
how long are capacity market agreements
what happens if I fail to deliver in a capacity market stress event
how do I bid into the capacity market
what is a capacity market agreement
who runs the capacity market auctions