Also known as: district heating, heat network, communal heating, district heat network, DH network, area-wide heating, teleriscaldamento, rete di teleriscaldamento, reti di teleriscaldamento
A heat network distributes heating, cooling or hot water from one or more central energy sources to multiple buildings through a system of insulated pipes. The UK has over 14,000 heat networks today serving roughly 3 % of heat demand, but government policy targets 7 % by 2035 and 20 % by 2050, backed by grant funding, new Ofgem regulation and a heat-network-zoning framework.
A heat network — also called district heating — is infrastructure that distributes heating, cooling or hot water from one or more central energy sources to multiple buildings via a system of insulated pipes, heat exchangers and substations. Sources can include large-scale heat pumps extracting energy from rivers or mine water, waste heat recovered from industrial processes or data centres, biomass boilers, geothermal wells and, historically, gas-fired combined heat and power (CHP) plants. The UK currently has more than 14,000 heat networks providing roughly 3 % of total heat demand, the majority serving social housing, hospitals, universities and public buildings. Government policy — set out in the Warm Homes Plan of January 2026 — targets 7 % of England's heat demand from networks by 2035, rising to approximately 20 % by 2050.
A heat network has three functional layers:
Operators sell heat to end consumers — typically under long-term heat-supply contracts. In public-sector schemes, a local authority or NHS trust often acts as both anchor customer and scheme sponsor, sometimes establishing a special-purpose vehicle (SPV) or appointing a private-sector Energy Services Company (ESCO) to design, build, finance and operate the network. The commercial relationship between network operator and heat customer is increasingly structured as a heat purchase agreement (HPA), analogous to a power purchase agreement but for thermal energy — a model that will have its own future glossary entry.
Heat networks generate substantial procurement activity across their lifecycle. The design and construction phase involves civil engineering, pipework, heat-pump supply, energy-centre fit-out and building-connection works. The operational phase requires metering, billing, maintenance and long-term fuel or electricity supply contracts. Typical buyers include local authorities, combined authorities, housing associations, NHS trusts and universities — organisations with large, predictable heat loads that can serve as anchor customers to underwrite network economics.
Two government funding programmes have shaped the market. The Heat Networks Investment Project (HNIP), launched in 2018, provided £304 million in grants and loans before closing in 2022. Its successor, the Green Heat Network Fund (GHNF), launched in 2022 as a capital grant programme supporting commercialisation, construction, retrofitting and expansion of low-carbon heat networks in England and Wales. The government confirmed in January 2026 that the GHNF will continue to at least 2029/30 at up to £195 million per year. Public, private and third-sector organisations can apply, with grants covering up to (but not including) 50 % of eligible costs. The GHNF is delivered by Triple Point Heat Networks Investment Management on behalf of DESNZ.
Ofgem regulation. From 27 January 2026, Ofgem became the statutory regulator for heat networks across Great Britain under the Heat Networks (Market Framework) Regulations 2025, made under the Energy Act 2023. Operators and suppliers must comply with authorisation conditions covering fair pricing, consumer protection, billing transparency and complaint handling. Existing networks received deemed authorisation but must formally register with Ofgem by 26 January 2027; operating without registration after that date is a criminal offence.
Heat network zoning. The Energy Act 2023 also grants powers for heat network zoning in England. The government's January 2026 consultation response confirmed the framework: a Central Authority within DESNZ will coordinate nationally, while local authorities or combined authorities act as Zone Coordinators. Within designated zones, buildings with high heat demand may be required to connect. Advanced Zoning Programme pilots in Leeds, Plymouth, Bristol, Stockport, Sheffield and parts of London are expected to reach construction by the end of 2026, with broader national rollout to follow.
Decarbonisation trajectory. Older networks often relied on gas CHP, which is being phased out as the electricity grid decarbonises. New GHNF-funded schemes must demonstrate a low-carbon approach, and the forthcoming Heat Network Technical Assurance Scheme (HNTAS) will set mandatory performance and emissions standards with limits that tighten over time toward net zero.
Procurement route. Public-sector sponsors must consider whether heat-supply contracts constitute covered procurement under the Procurement Act 2023 (or its predecessors) or whether a zone-developer ESCO can be directly appointed. Getting this right matters because public buildings are frequently the anchor loads that make a network financially viable.
[heat-pumps] — the dominant low-carbon generation technology for new networks. [retrofit] — fabric improvements reduce building heat demand and affect network sizing. [green-hydrogen] — a potential future fuel for networks in hard-to-electrify industrial zones.