Retrofit

Also known as: building retrofit, deep retrofit, whole house retrofit, energy renovation, fabric first, EPC upgrade, SHDF, Social Housing Decarbonisation Fund, HUG, Home Upgrade Grant, ECO, Energy Company Obligation, PAS 2035, PAS 2030, retrofit assessment, riqualificazione energetica, ristrutturazione energetica

Retrofit is the whole-building renovation of existing homes to cut energy use and carbon — combining insulation, low-carbon heating and renewables under a fabric-first, PAS 2035 approach. In the UK it drives large social-housing and public-estate procurement through grant programmes like the Warm Homes: Social Housing Fund.

What it is

Retrofit is the upgrading of an existing building to improve its energy performance, comfort and carbon footprint — distinct from new build, where efficiency is designed in from scratch. Modern UK retrofit is rarely a single measure. It treats the home as one connected system, layering insulation, draught-proofing, ventilation, low-carbon heating (typically a heat pump) and often solar or battery storage so the measures work together rather than against each other. The governing standard for this whole-house, quality-assured approach is PAS 2035, with its companion installation standard PAS 2030.

How it works

The discipline behind UK retrofit is "fabric first": cut a building's heat demand with measures like added insulation and better windows before specifying any low-carbon heating or renewables. Doing it in this order means a heat pump can be sized smaller and run more efficiently, and avoids unintended consequences like damp or overheating.

Government-funded projects must follow PAS 2035, the BSI standard introduced in 2019 and substantially revised in 2023. Compliance is mandatory for any retrofit using government funding, including ECO and the Warm Homes programmes, and the 2023 revision became compulsory for new work from 30 March 2025, so every current programme runs on PAS 2035:2023. The standard splits responsibilities across defined roles: a Retrofit Assessor surveys the property and produces a whole-house assessment, a Retrofit Coordinator manages the project end to end and signs off its compliance against PAS 2035, and accredited installers carry out the works to PAS 2030. All projects are lodged with TrustMark, the government-endorsed quality scheme.

Why it matters in procurement / cleantech

Retrofit is one of the largest sources of public-sector cleantech procurement in the UK, concentrated in social housing and the public estate. The flagship programme is the Warm Homes: Social Housing Fund (WH:SHF). Formerly the Social Housing Decarbonisation Fund Wave 3, it helps social-housing providers insulate homes, raise energy efficiency and upgrade heating, with provider match funding on top — £1.29bn confirmed for 2025–2028. The measures it funds reflect a typical retrofit package: solar PV is the most common at around 42% of installations, followed by insulation (~36%) and low-carbon heating (~13%).

For low-income owner-occupiers and private renters off the gas grid, the equivalent programme is the Home Upgrade Grant (HUG), which channels council funding to low-income English households for efficiency upgrades and low-carbon heating. Eligibility is tightly drawn: a home must be off the mains gas grid with an EPC of D to G, and the applicant must meet income thresholds set by the administering local authority.

The key point for suppliers is who holds the money and who runs the tender. These are grant-funded programmes — the grant funds the buyer (a council, housing association or registered provider), who then procures assessment, coordination, installation and materials from the market. That is why retrofit entries carry no commercial-model tag: the funding mechanism sits upstream of the contract you bid into. Programme statistics, allocations and TrustMark lodgements together form a visible forward pipeline of upcoming works.

Common types / variants

  • Domestic retrofit — homes, governed by PAS 2035/2030. The bulk of UK funded activity.
  • Fabric-first / single-measure — e.g. loft or cavity wall insulation, sometimes routed through lighter-touch schemes rather than full whole-house process.
  • Deep / whole-house retrofit — coordinated multi-measure packages aiming for a step change in EPC and bill savings.
  • Non-domestic retrofit — public buildings and commercial stock, often funded via separate decarbonisation schemes.

Key considerations

The funding landscape is consolidating and shifting fast. The Warm Homes: Social Housing Fund and Warm Homes: Local Grant will initially continue separately, then consolidate into a single scheme for low-income households from 2027/28. The legacy energy-supplier obligation is winding down: the Great British Insulation Scheme ended on 31 March 2026, ECO4 was extended to 31 December 2026 to allow remediation of non-compliant installations, and £1.5bn originally allocated to ECO is being redirected to the Warm Homes funds. Above all of this sits the government's Warm Homes Plan, targeting up to 5 million home upgrades by 2030. Delivery is increasingly devolved — Greater Manchester and the West Midlands now receive their WH:SHF allocations directly rather than bidding to the national scheme — so suppliers must track both national rounds and combined-authority routes. Always confirm the live scheme rules, deadlines and devolution arrangements on GOV.UK before bidding.

Related terms

[heat-pumps] are the most common low-carbon heating measure installed under a retrofit package.

what is retrofit in housing
what is whole-house retrofit
what is PAS 2035
difference between PAS 2035 and PAS 2030
what is the fabric first approach
what is the Warm Homes Social Housing Fund
what replaced the Social Housing Decarbonisation Fund
what is the Home Upgrade Grant
who is eligible for HUG2
what is ECO4 retrofit
what does a retrofit coordinator do
how do councils procure retrofit
heat pumps