Carbon Capture, Usage and Storage (CCUS)

Also known as: carbon capture, CCS, CCUS, CO2 capture, carbon sequestration, point source capture, carbon capture and storage

Carbon Capture, Usage and Storage (CCUS) is a chain of technologies that separates CO₂ from industrial or power-generation exhaust gases, then either reuses it in products and processes or injects it into deep geological formations for permanent storage — preventing it from entering the atmosphere and contributing to climate change.

What it is

Carbon Capture, Usage and Storage (CCUS) is an umbrella term for a suite of technologies that prevent carbon dioxide from reaching the atmosphere. The process captures CO₂ at source — from power stations, cement kilns, hydrogen reformers, waste-to-energy plants and other large emitters — then either puts it to productive use (the "U") or locks it away permanently underground (the "S"). Internationally, bodies such as the IPCC and the IEA consider CCUS essential for meeting net-zero targets, particularly in hard-to-abate sectors where electrification alone cannot eliminate emissions. In the UK, the government treats CCUS as a pillar of industrial decarbonisation, with DESNZ analysis suggesting the sector could generate £4–5 billion in gross value added per year and support around 50,000 jobs in the 2030s.

How it works

CCUS operates as a three-stage chain: capture, transport and either usage or storage.

1. Capture. CO₂ is separated from the flue gases of an industrial process or power plant. The most common method is post-combustion capture, in which exhaust gas passes through a chemical solvent — typically an amine-based liquid — that absorbs the CO₂. The solvent is then heated to release a concentrated CO₂ stream. Alternatives include pre-combustion capture (converting fuel into hydrogen and CO₂ before burning) and oxy-fuel combustion (burning fuel in pure oxygen to produce a CO₂-rich exhaust). Projects typically target capture rates of 90 % or above, though real-world performance can vary.

2. Transport. Once captured, CO₂ is compressed — usually into a dense, supercritical fluid — and moved to a storage or usage site. Pipelines are the primary method for large volumes; non-pipeline transport by ship, rail or road is being developed for emitters that are remote from pipeline networks.

3a. Storage ("S"). CO₂ is injected into deep geological formations at depths generally exceeding 800 metres, where pressure and temperature keep it in a dense phase. Suitable reservoirs include depleted oil and gas fields and deep saline aquifers, sealed above by impermeable cap-rock. Multiple trapping mechanisms — structural, residual, solubility and mineral — work together over time to lock the CO₂ in place, with well-selected sites expected to retain over 99 % of injected CO₂ for thousands of years. The UK Continental Shelf offers an estimated 78 billion tonnes of storage capacity, roughly one-third of Europe's total, much of it in depleted North Sea fields whose geology is already well-characterised.

3b. Usage ("U"). Some captured CO₂ is put to commercial use: enhanced oil recovery, production of building aggregates, carbonation of concrete or conversion into synthetic fuels and chemicals. However, only uses that permanently mineralise the CO₂ deliver a durable climate benefit — most utilisation pathways store far less carbon than dedicated geological injection.

Why it matters in procurement / cleantech

CCUS is one of the UK's most capital-intensive infrastructure programmes. In October 2024 the government committed up to £21.7 billion over 25 years for the first Track-1 CCUS projects, with the 2025 Spending Review confirming a further £9.4 billion parliamentary commitment covering Track-2 development. Every cluster that reaches financial close triggers a major wave of EPC, civil engineering, pipeline, fabrication, commissioning and long-term operations and maintenance contracts.

The Track-1 clusters — HyNet in the North West and North Wales and the East Coast Cluster (ECC) in Teesside — are the furthest advanced. By December 2024 the ECC transport and storage network (run by the Northern Endurance Partnership) and the Net Zero Teesside Power project reached financial close, and in April 2025 HyNet's transport and storage network followed. Five capture projects are now in construction, spanning gas power generation, cement and energy-from-waste, with first operations expected from 2028. The Track-2 clusters — Acorn in north-east Scotland and Viking CCS in the Humber — have received development funding and aim for financial close within the current parliamentary term.

For suppliers, the published project lists and cluster plans are a forward procurement pipeline: capture-plant equipment, CO₂ compressors, subsea pipeline installation, drilling, monitoring systems, digital controls and specialist consulting are all in active demand. A further 100-plus capture projects are in development across the UK, representing a potential 77 million tonnes per year of CO₂ capture capacity.

Common types / variants

  • Point-source CCS. Capturing CO₂ directly from an industrial flue stack — the core of UK cluster projects covering power, cement, refining, chemicals and waste-to-energy.
  • Carbon capture and usage (CCU). Diverting captured CO₂ into products such as construction aggregates, synthetic fuels or carbonated concrete. Climate benefit depends on whether the CO₂ is permanently mineralised or later re-released.
  • Bioenergy with CCS (BECCS). Capturing CO₂ from biomass combustion or fermentation, producing negative emissions because the feedstock absorbed CO₂ while growing.
  • Direct air capture (DAC). Removing CO₂ directly from ambient air rather than from a point source, typically using engineered sorbents or solvents; currently the most expensive pathway but a key technology for greenhouse gas removals.

Key considerations

  • Policy is evolving rapidly. DESNZ acknowledged in December 2024 that the original ambition to capture 20–30 million tonnes per year by 2030 is no longer achievable and has not yet set a revised target. The CCSA reports that 27 capture projects have been cancelled or paused since 2023, with 75 % of developers surveyed warning they may redirect investment overseas without clearer policy.
  • Business models are bespoke. Government support flows through the Industrial Carbon Capture (ICC) contract, the Dispatchable Power Agreement (DPA) for power CCUS, and the Transport and Storage Regulatory Investment (TRI) model — not the CfD framework used for renewables. Terms continue to be updated; a Transition Access Agreement was published in draft in February 2026.
  • Capture rate verification matters. Many proposals cite 90 %+ capture rates, but real-world operational data from early large-scale facilities has sometimes fallen short, making independent monitoring and reporting a key due-diligence area.
  • Cluster sequencing drives timing. Projects outside a government-backed cluster currently lack a clear route to market, though DESNZ is engaging on future allocation frameworks and non-pipeline transport options.
  • Consumer levy exposure. Around three-quarters of the £21.7 billion Track-1 funding comes from levies on electricity consumers rather than the Exchequer, a point of ongoing parliamentary scrutiny.

Related terms

[net-zero] · [decarbonization] · [green-hydrogen] · [engineering-procurement-and-construction].

what is CCUS
what is the difference between CCS and CCUS
how does carbon capture and storage work
what are the UK CCUS clusters
what is the Track-1 Track-2 cluster sequencing process
how much CO2 can the UK store
what is the £21.7 billion CCUS funding for
where is captured CO2 stored
what is the East Coast Cluster
what is HyNet carbon capture
what is the Acorn CCS project
what is the difference between carbon capture and carbon usage
how is CO2 transported for storage
what industries need CCUS to decarbonise